Ganymirra and Majors Creek Solar Power Stations ​
Location
Townsville region, Queensland
Sector
Energy
Client
Edify Energy​
Timeline
Commenced 2026

DT Infrastructure (DTI) is the principal contractor for Edify Energy on the Ganymirra and Majors Creek Solar Project in North Queensland, near Townsville, on the traditional lands of the Bindal people.

The Project will comprise 360MWp of solar generation and a 300MW/1,200MWh integrated battery energy storage System (BESS), forming a key contribution to Queensland’s renewable energy future.

At peak construction, the Project is expected to support approximately 400 jobs.

The Ganymirra and Majors Creek Solar Project showcases how renewable generation and battery storage can work together to deliver a more resilient energy grid for Queensland.

Scope

As the main Engineering, Procurement and Construction (EPC) contractor, DTI is responsible for delivering the core project scope, including: 

  • Constructing transmission connection infrastructure for a 360MWp combined solar farm.
  • Building an integrated 300MW/1,200MWh BESS.
  • Executing all civil works within the facility to support the project’s transmission network service provider Powerlink.
  • Installing, securing and integrating solar panel modules onto solar tracking infrastructure.
  • Delivering all the electrical infrastructure to integrate the facility and all temporary works. 
  • Delivering supporting infrastructure for ongoing operation and maintenance requirements. 

Following completion and grid connection, DTI will transition to providing Operations & Maintenance services to the facility and its assets for 2 years.

360MWp

Delivering transmission connection infrastructure for a 360MWp combined solar farm.

273,697t

Removing over 273,697 tonnes of CO2 from the environment each year.

400

Creating around 400 jobs.

300MW/1,200MWh

Constructing an integrated 300MW/1,200MWh BESS.

Social impact

DTI is committed to leaving a lasting social and economic legacy for the Townsville community through collaboration and sustainable practices including:

  • Creating around 400 jobs and actively utilising local contractors to support the region’s economy.
  • Removing over 273,697 tonnes of CO2 from the environment each year.

For local business opportunities please contact: MCP-Enquiry@dtinfrastructure.com.au

Energy News

Energy Projects

Deliverables
  • Modernising Transperth’s signalling and train control technology to a digital solution, with upgrades to signalling along the total length of track on the Transperth network.
  • Installation of more than 7,000 transponders enabling precise train location.
  • In-cab signalling equipment for 125 trains including the Prospector, AvonLink and Australind regional trains.
  • Improved passenger information with more than 600 displays at 87 stations across the network.
  • ⁠Installation of more than 250km of electrical conduit.

News loop title

Projects loop title

×